Landscaping
Section II.BB. Rushbrooke South, Rushbrooke North 1-6, Rushbrooke North 7-8
  1. All open lot areas shall be sodded and the front of each residence professionally landscaped within 30 days of completion of home. Plant material shall be sufficient in size, quantity and spacing to achieve a full foundation planting across the entire front elevation of the home.
  2. In addition to plantings along the foundation, the owner of each lot shall be required to install a minimum of one (1) tree in the front yard (minimum size 2” diameter). If existing trees remain on lot, this requirement shall have been waived. 
  3. The use of artificial or manmade plant material is prohibited. Seasonal and holiday exterior decorations may be used if timely and seasonably displayed.